11/21/2023 0 Comments Silo fire pit areaThe production levels below level 36 have been redesigned to capture the potential mining recovery of these zones. Agnico Eagle continues drilling to better identify the internal zones that have the potential to improve the production profile at Odyssey South. The extraction of the first stope at Odyssey South in the second quarter of 2023 has shown positive reconciliation with respect to tonnes and gold grade, reflecting the potential contribution from internal zones (previously unclassified mineralized zones within the porphyry, currently being infill drilled and defined).The commissioning of the paste plant was expected to be completed in the third quarter of 2023, which will facilitate the production ramp-up to the design rate of 3,500 tonnes per day (“tpd”) in 2024.Shaft sinking activities increased through the quarter, with the ongoing commissioning of shaft sinking equipment. ![]()